No favourites
Grid: 13 × 10
Gauge: Aran — 18 sts × 24 rows / 4 in
MC
CC1
(1/1 Right Purl Cross): Slip next stitch onto cable needle and hold at back of work; k1tbl, then p1 from cable needle.
(1/1 Left Purl Cross): Slip next stitch onto cable needle and hold at front of work; p1, then k1 from cable needle.
Knit
Purl
purl
p1tbl
k1tbl
Bobble
Updated today