No favourites
Grid: 16 × 28
Gauge: Aran — 18 sts × 24 rows / 4 in
MC
CC1
1/1 Right Purl Cross: Slip next stitch onto cable needle and hold at back of work; k1tbl, then p1 from cable needle.
knit on right side (k) , purl on wrong side (p)
Purl
purl
ktbl right side, ptbl wrong side
1/1 RPC Slip next stitch onto cable needle and hold at back of work; k1tbl, then p1 from cable needle.
Bobble
yo
ssk
Updated today